Project of Utilities extension in Katamia Investment Zone
Owner: Cairo
Governorate, Housing and Utilities Directorate
Consulting Office: Dr. Ahmed Abdel Wareth
Contractor: Arab Contractors Company
Project's total area: 1000 acres
Allocated area for investment: 775 acres
Area of roads, services, and landscapes: 225 acres
Project Features
Total value of the project: 96.5 Million
Egyptian Pounds
Project's Length: 4.5 km from Zahraa
El-Maadi to El-Ain Sokhna Road
Project's Width: 2.5 km, north and south of Cairo's Ring
Road
The project includes:
Road
and lightening works at a cost of 42 million (43%)
Water
network works at a cost of 25 million (26%)
Sanitation
networks at a cost of 17 million (18%)
High water storage tank (with capacity of m3)
at a cost of 3 million (3%)
Sewage
pumping station& electromechanical at a cost of 9.5 million (10%)
Total value of the project: 96.5 million
pounds
Sewage Pumping Station:
Current
energy of station 20000 m3/ day
The station consists of:
Pumps building: contains three
water pumps and prepared for the installation of 5 water pumps for future extensions
to reach an energy of 100000 m3
Generators building: equipped with 1
generator with a capacity of 20 kw 3-phase, 380 volt ( 50 pulse/ w- 1500 roll/
m) to work in the case of power outage and prepared for 2 generators for future
extension
Converter building: contains 2
electric transformers with 500 k volt/ convertor, public and sub electricity boards,
2 converters for future extension.
Warehouses and workshops building
Gas tanks
Administrative building
Fence and guard room
Concrete works