Project of Utilities extension in Katamia Investment Zone

Project of Utilities extension in Katamia Investment Zone

 

Owner: Cairo Governorate, Housing and Utilities Directorate

Consulting Office: Dr. Ahmed Abdel Wareth

Contractor: Arab Contractors Company

Project's total area: 1000 acres

Allocated area for investment: 775 acres

Area of roads, services, and landscapes: 225 acres

 

Project Features

Total value of the project: 96.5 Million Egyptian Pounds

Project's Length: 4.5 km from Zahraa El-Maadi to El-Ain Sokhna Road

Project's Width: 2.5 km, north and south of Cairo's Ring Road

The project includes:

Road and lightening works at a cost of 42 million (43%)

Water network works at a cost of 25 million (26%)

Sanitation networks at a cost of 17 million (18%)

 High water storage tank (with capacity of m3) at a cost of 3 million (3%)

Sewage pumping station& electromechanical at a cost of 9.5 million (10%)

Total value of the project: 96.5 million pounds


Sewage Pumping Station:

Current energy of station 20000 m3/ day

The station consists of:

Pumps building: contains three water pumps and prepared for the installation of 5 water pumps for future extensions to reach an energy of 100000 m3   

Generators building: equipped with 1 generator with a capacity of 20 kw 3-phase, 380 volt ( 50 pulse/ w- 1500 roll/ m) to work in the case of power outage and prepared for 2 generators for future extension

Converter building: contains 2 electric transformers with 500 k volt/ convertor, public and sub electricity boards, 2 converters for future extension.

Warehouses and workshops building

Gas tanks

Administrative building

Fence and guard room

Concrete works

 

Source: Investor Service Office, Cairo Governorate